This is to certify that WAPCOS Limited was awarded the work for Engineering Design and Construction Supervision of Irrigation Schemes (Central and Western Regions)in Ghana.The Engineering design and construction supervision have been successfully completed.The performance of WAPCOS during the project was excellent. April, 2016
This is to certify that WAPCOS Limited was awarded the work for Engineering Design and Construction Supervision of Irrigation Schemes (Central and Western Regions)in Ghana.The Engineering design and construction supervision have been successfully completed.The performance of WAPCOS during the project was excellent.
This is to certify that WAPCOS has been awarded following projects: Concurrent Evaluation of Gosikhurd National Project, Dist. Bhandara Design Consultancy Services for Kati-Pati Barrage Lift Irrigation Project Kwatha barrage Lift Irrigation Project Purna Barrage-2 (NerDhamna) Lift Irrigation Scheme Pedhi Barrage Lift Irrigation Scheme WAPCOS carried out all the activities with utmost professionalism and in a time bound manner for success ful completion of projects. April,2016
This is to certify that WAPCOS has been awarded following projects:
This is to certify that WAPCOS was awarded “Survey work for River X Section Reservoir of Chutuk Power Station, Minji, Kargil”. WAPCOS has satisfactorily completed the above mentioned work.The performance of WAPCOS was found highly appreciable and we wish them success in future. April, 2016
This is to certify that WAPCOS was awarded “Survey work for River X Section Reservoir of Chutuk Power Station, Minji, Kargil”. WAPCOS has satisfactorily completed the above mentioned work.The performance of WAPCOS was found highly appreciable and we wish them success in future.
This is to certify that WAPCOS Limited (A Government of India Undertaking under the Ministry of Water Resources, River Development and Ganga Rejuvenation) has been working as the Project Management Consultant for Turkey Project for Ensuring Food Security through increased Maize Production by Soil Conditioning, Farm Mechanization and Granular Fertilizer Application in Swaziland. We wish to put on record that WAPCOS have been carrying out all the above mentioned activities with utmost professionalism and in a time bound manner. February, 2016
This is to certify that WAPCOS Limited (A Government of India Undertaking under the Ministry of Water Resources, River Development and Ganga Rejuvenation) has been working as the Project Management Consultant for Turkey Project for Ensuring Food Security through increased Maize Production by Soil Conditioning, Farm Mechanization and Granular Fertilizer Application in Swaziland. We wish to put on record that WAPCOS have been carrying out all the above mentioned activities with utmost professionalism and in a time bound manner.
WAPCOS in association with OASIS Design Inc. New Delhi was appointed by Guwahati Municipal Corporation for Preparation of the proposal for Smart City Challenge.The concept was appreciated by the citizens and the city could get selected in one of the 20 Smart Cities in India in first phase due to untiring efforts made by WAPCOS. The estimated cost of the proposed Smart City Plan is approximatel Rupees 2256 Crore. WAPCOS has completed and prepared viable proposal and effective financial model with inavailable resources infully professional manner. We put inrecord and appreciat ethe efforts taken by WAPCOS.The performance of WAPCOS is rated as excellent. February, 2016
WAPCOS in association with OASIS Design Inc. New Delhi was appointed by Guwahati Municipal Corporation for Preparation of the proposal for Smart City Challenge.The concept was appreciated by the citizens and the city could get selected in one of the 20 Smart Cities in India in first phase due to untiring efforts made by WAPCOS. The estimated cost of the proposed Smart City Plan is approximatel Rupees 2256 Crore. WAPCOS has completed and prepared viable proposal and effective financial model with inavailable resources infully professional manner. We put inrecord and appreciat ethe efforts taken by WAPCOS.The performance of WAPCOS is rated as excellent.
The Project Managment Consultants WAPCOS Limited has carried out Project Management Consultancy Services for Extension of Lake Victoria Water Supply Pipeline to Tabora, Lgunga and Nzega Towns, prepared and submitted the Detailed Project Reports.The estimated cost of works in USD 268.35 Million The reports were accepted and the work of WAPCOS was found good. Janurary, 2016
The Project Managment Consultants WAPCOS Limited has carried out Project Management Consultancy Services for Extension of Lake Victoria Water Supply Pipeline to Tabora, Lgunga and Nzega Towns, prepared and submitted the Detailed Project Reports.The estimated cost of works in USD 268.35 Million The reports were accepted and the work of WAPCOS was found good.
This is to certify that WAPCOS has satisfactorily completed work of Irrigation Studies of Command Area lying in Indian Territory under Sapta Kosi High Dam Multipurpose Project including field activities such as Topographical and Soil Surveys for an area of 70,000 ha, Canal Alignment Surveys, Cadastral Surveys and Geotechnical Investigations for Canal Network of 580 kms. May, 2015
This is to certify that WAPCOS has satisfactorily completed work of Irrigation Studies of Command Area lying in Indian Territory under Sapta Kosi High Dam Multipurpose Project including field activities such as Topographical and Soil Surveys for an area of 70,000 ha, Canal Alignment Surveys, Cadastral Surveys and Geotechnical Investigations for Canal Network of 580 kms.
WAPCOS has provided “Operation & maintenance support for Hwange Power Station” for 4th year through deployment of experts having expertise in various fields and successfully completed this year contract in April, 2015. I appreciate the commendable contribution by your experts towards improvement in performance of Hwange Power Station and skills upgradation of Zimbabwean officials. May, 2015
WAPCOS has provided “Operation & maintenance support for Hwange Power Station” for 4th year through deployment of experts having expertise in various fields and successfully completed this year contract in April, 2015. I appreciate the commendable contribution by your experts towards improvement in performance of Hwange Power Station and skills upgradation of Zimbabwean officials.
This is to certify that WAPCOS is providing “Detailed Engineering and Project Management Consultancy Services for Provision of Buildings and Work Services” at Missamari (Assam). WAPCOS is professionally competent PSU and their performance has been very good. May, 2015
This is to certify that WAPCOS is providing “Detailed Engineering and Project Management Consultancy Services for Provision of Buildings and Work Services” at Missamari (Assam). WAPCOS is professionally competent PSU and their performance has been very good.
This is to certify that WAPCOS has successfully completed the work of “Project Management for Demolition and Reconstruction of North Jetty, Naval Base at Kochi – Phase I – Concept Design & DPR”. WAPCOS has done a commendable job in this project and submitted the reports in time. We would like to put on record our appreciation on the relentless and sincere work put in by WAPCOS in preparation of reports and completion of this project. May, 2015
This is to certify that WAPCOS has successfully completed the work of “Project Management for Demolition and Reconstruction of North Jetty, Naval Base at Kochi – Phase I – Concept Design & DPR”. WAPCOS has done a commendable job in this project and submitted the reports in time. We would like to put on record our appreciation on the relentless and sincere work put in by WAPCOS in preparation of reports and completion of this project.
Let me thank the Team of WAPCOS for successful completion of proto-type experiment in the form shore dumping and other forms of dredging and disposal, as has been commenced in October 2013 with collection – analysis – modeling of hydrological data and tried on field from 11th April 2014 to 23rd April 2015. The success of the experiment has paved its way for establishing the theory of Tidal Hydraulic Engineering in concurrence with the concept of quick dispersion of dredge material while side casted as projectile. May, 2015
Let me thank the Team of WAPCOS for successful completion of proto-type experiment in the form shore dumping and other forms of dredging and disposal, as has been commenced in October 2013 with collection – analysis – modeling of hydrological data and tried on field from 11th April 2014 to 23rd April 2015. The success of the experiment has paved its way for establishing the theory of Tidal Hydraulic Engineering in concurrence with the concept of quick dispersion of dredge material while side casted as projectile.
I wish to place on record my heartfelt appreciation for successful completion of the project “Construction of Pre-Engineering Building for Storage of Census 2011 & NPR Records at Bhubaneswar” with an estimated cost of 12.75 Crores. The Pre-Engineering Building constructed by WAPCOS is understandably Eco-Friendly, Safe and Earth-Quake Resistant. We record the gratefulness to the WAPCOS, their key personnel and for demonstration of a professional approach by the team during the execution of the project. May 2015
I wish to place on record my heartfelt appreciation for successful completion of the project “Construction of Pre-Engineering Building for Storage of Census 2011 & NPR Records at Bhubaneswar” with an estimated cost of 12.75 Crores. The Pre-Engineering Building constructed by WAPCOS is understandably Eco-Friendly, Safe and Earth-Quake Resistant. We record the gratefulness to the WAPCOS, their key personnel and for demonstration of a professional approach by the team during the execution of the project.
Certify that WAPCOS has done Third Party Inspection in Erection components and Inspection of Materials. The work was completed satisfactory. WAPCOS employees worked with utmost sincerity, dedication and handled the project professionally. May, 2015
Certify that WAPCOS has done Third Party Inspection in Erection components and Inspection of Materials. The work was completed satisfactory. WAPCOS employees worked with utmost sincerity, dedication and handled the project professionally.
“I would like to put on record hard-work done by WAPCOS’ Officers in Surveys and Demarcation of Defence Land in Delhi Cantonment. Your Officers worked with utmost sincerity, dedication & devotion in completing survey works of Delhi Cantonments which was a gigantic task in itself” April 2014
“I would like to put on record hard-work done by WAPCOS’ Officers in Surveys and Demarcation of Defence Land in Delhi Cantonment. Your Officers worked with utmost sincerity, dedication & devotion in completing survey works of Delhi Cantonments which was a gigantic task in itself”
WAPCOS has carried out the project of Preparation of Strategic Drought Mitigation Plan” professionally. The team has been very Co-operative and believed in working in team spirit and has always supportive in sharing of technical know-how and knowledge cum experience. March, 2015
WAPCOS has carried out the project of Preparation of Strategic Drought Mitigation Plan” professionally. The team has been very Co-operative and believed in working in team spirit and has always supportive in sharing of technical know-how and knowledge cum experience.
“WAPCOS team support for Hwange Power Station is appreciated and it has helped us to maintain plant availability and improvement in power generation” Mar, 2015
“WAPCOS team support for Hwange Power Station is appreciated and it has helped us to maintain plant availability and improvement in power generation”
This is to certify that WAPCOS has successfully completed the project of Preparation of Strategy Paper on Integrated Water Resource Development and Management for - SAVE River Basin in ZimbabweSankuru River Basin in DR Congo The services provided by WAPCOS were satisfactory and work was executed in a professional and efficient manner. March, 2015
This is to certify that WAPCOS has successfully completed the project of Preparation of Strategy Paper on Integrated Water Resource Development and Management for -
WAPCOS is providing Consultancy services for “Construction Supervision of Power Sector Project” from January 2013 for a duration of 26 months. The scope of works involves Design Engineering/ Project Engineering, Inspection of Electrical Equipment/Project Materials, Project Sites Monitoring/ Construction supervision and other project related issues/activities of Power Sector Project, funded by World Bank & Republic of Yemen. The Performance of the Company is very good. March, 2015
WAPCOS is providing Consultancy services for “Construction Supervision of Power Sector Project” from January 2013 for a duration of 26 months. The scope of works involves Design Engineering/ Project Engineering, Inspection of Electrical Equipment/Project Materials, Project Sites Monitoring/ Construction supervision and other project related issues/activities of Power Sector Project, funded by World Bank & Republic of Yemen. The Performance of the Company is very good.
This is to certify that WAPCOS has successfully completed the project of “Preparation of Strategy Paper on Integrated Water Resource Development and Management for Lake Chad Basin (Niger, Nigeria, Chad and Cameroon). The services provided by WAPCOS were satisfactory and work was executed in a professional and efficient manner. March, 2015
This is to certify that WAPCOS has successfully completed the project of “Preparation of Strategy Paper on Integrated Water Resource Development and Management for Lake Chad Basin (Niger, Nigeria, Chad and Cameroon). The services provided by WAPCOS were satisfactory and work was executed in a professional and efficient manner.
WAPCOS have successfully completed the study on “Flood Mitigation measures for Dholera Special Investment Region area”. We appreciate their sincere efforts and quality services that are rendered throughout the project tenure. March, 2015
WAPCOS have successfully completed the study on “Flood Mitigation measures for Dholera Special Investment Region area”. We appreciate their sincere efforts and quality services that are rendered throughout the project tenure.
I express my sincere regards and congratulate you and your team for successfully completing the process of obtaining Environmental Clearances from MoEF for our project “Formation of flood Carrier Canal by interlinking of Tamiraparani, Karumeniyar and Nambiyar rivers in Tirunelveli and Thoothukudi Districts of Tamil Nadu”. It shall be our endeavor to engage the services in future also in our other upcoming projects and I wish that the WAPCOS Team shall be working with same zeal and confidence. March,2015
I express my sincere regards and congratulate you and your team for successfully completing the process of obtaining Environmental Clearances from MoEF for our project “Formation of flood Carrier Canal by interlinking of Tamiraparani, Karumeniyar and Nambiyar rivers in Tirunelveli and Thoothukudi Districts of Tamil Nadu”. It shall be our endeavor to engage the services in future also in our other upcoming projects and I wish that the WAPCOS Team shall be working with same zeal and confidence.
“I would like to congratulate the WAPCOS team for their organization of this study tour. The professionalism, efficiency and teamwork at WAPCOS and the other agencies with whom we met was beyond our expectations and highly commendable ”. “I wish to indicate that this visit was highly informative, pioneering and created wide opportunities for collaboration and team work in several areas including training and development in Water, Wastewater, General Management and Leadership programs, technical & other specialized training programs, project attachments, exchange visits, short courses, long-term degree and masters programs and project management and consultancy services”. February, 2015
“I would like to congratulate the WAPCOS team for their organization of this study tour. The professionalism, efficiency and teamwork at WAPCOS and the other agencies with whom we met was beyond our expectations and highly commendable ”. “I wish to indicate that this visit was highly informative, pioneering and created wide opportunities for collaboration and team work in several areas including training and development in Water, Wastewater, General Management and Leadership programs, technical & other specialized training programs, project attachments, exchange visits, short courses, long-term degree and masters programs and project management and consultancy services”.
WAPCOS has completed the following projects with a quality output and to our full satisfaction: Network Planning, Designing & Estimates of sub Minors as Under Ground Pipe Line for LIMBDI Branch Canal DHRANGDHRA Branch Canal MORBI Branch Canal March, 2015
WAPCOS has completed the following projects with a quality output and to our full satisfaction: Network Planning, Designing & Estimates of sub Minors as Under Ground Pipe Line for
On behalf of WRD, Chattisgarh, I thank and extend warm regards to the team from WAPCOS, for the successful completion of Arpa Bhaisajhar Barrage Project in Bilaspur. It shall be our Endeavour to engage the services in future also in our upcoming projects and I wish that the WAPCOS team shall be working with full zeal and confidence. March, 2015
On behalf of WRD, Chattisgarh, I thank and extend warm regards to the team from WAPCOS, for the successful completion of Arpa Bhaisajhar Barrage Project in Bilaspur. It shall be our Endeavour to engage the services in future also in our upcoming projects and I wish that the WAPCOS team shall be working with full zeal and confidence.
This is to certify that WAPCOS is involved in project management consultancy for sewerage, roads, bridge works. Cost of the Project is Rs. 67.00 crore and the services provided by WAPCOS till date is at very satisfactory level. March, 2015
This is to certify that WAPCOS is involved in project management consultancy for sewerage, roads, bridge works. Cost of the Project is Rs. 67.00 crore and the services provided by WAPCOS till date is at very satisfactory level.
We have received the inception Report for “Siem Reap River Basin – Development of Master Plan, Cambodia” and we appreciate your efforts. The technical content of the report is of high quality and the presentation is quite good. The report adequately covers various aspects of the Master Plan including problems and issues faced in the area. February, 2015
We have received the inception Report for “Siem Reap River Basin – Development of Master Plan, Cambodia” and we appreciate your efforts. The technical content of the report is of high quality and the presentation is quite good. The report adequately covers various aspects of the Master Plan including problems and issues faced in the area.
WAPCOS has successfully executed the following works : Low Lift Pumping Station High Lift Pumping Station We appreciate the commendable contribution by WAPCOS towards improvements in performance of DEKA Pumping Station. February, 2015
WAPCOS has successfully executed the following works :
“WAPCOS has completed the Water Services and Institutional Support project (Supervision of Network Expansion for Nacala). FIPAG hereby express it’s satisfaction with WAPCOS’s professional execution of the project”. January, 2015
“WAPCOS has completed the Water Services and Institutional Support project (Supervision of Network Expansion for Nacala). FIPAG hereby express it’s satisfaction with WAPCOS’s professional execution of the project”.
“WAPCOS as the Project Developer has provided concept to commissioning services covering feasibility Studies, Survey & Investigation, Design Engineering, Tender Engineering, Contract Management, Quality & Quantity Control, Pre-shipment Inspections, Capacity Building and executed the Project on turnkey basis successfully.” WAPCOS has done a commendable job and provided professional services which would help in development of the Water Resources system in Kampong Spue Province, Cambodia as a first Dam on perk Thot tributary. The performance of WAPCOS Ltd. is appreciated. October, 2014
“WAPCOS as the Project Developer has provided concept to commissioning services covering feasibility Studies, Survey & Investigation, Design Engineering, Tender Engineering, Contract Management, Quality & Quantity Control, Pre-shipment Inspections, Capacity Building and executed the Project on turnkey basis successfully.” WAPCOS has done a commendable job and provided professional services which would help in development of the Water Resources system in Kampong Spue Province, Cambodia as a first Dam on perk Thot tributary. The performance of WAPCOS Ltd. is appreciated.
“This is to certify that WAPCOS Ltd. has been providing Consultancy Services for Preparation of Feasibility Report, Tender Engineering, Design Engineering and Construction Supervision of 230kV & 115 kV Transmission Line & Associated Sub-station Projects”. “WAPCOS has successfully completed the Design Engineering, Pre Shipment Inspection at manufacture’s work, Supervision of Construction and Erection works commenced by EPC contract upto satisfactory of the Client”. “We are glad to inform that we are utmost pleased with the efforts and timely & quality services provided by WAPCOS. The services provided by WAPCOS are Excellent”. October, 2014
“This is to certify that WAPCOS Ltd. has been providing Consultancy Services for Preparation of Feasibility Report, Tender Engineering, Design Engineering and Construction Supervision of 230kV & 115 kV Transmission Line & Associated Sub-station Projects”. “WAPCOS has successfully completed the Design Engineering, Pre Shipment Inspection at manufacture’s work, Supervision of Construction and Erection works commenced by EPC contract upto satisfactory of the Client”. “We are glad to inform that we are utmost pleased with the efforts and timely & quality services provided by WAPCOS. The services provided by WAPCOS are Excellent”.
“We would like to bring to your attention that the feasibility report submitted to you was prepared by WAPCOS after field visits and in consultations with various stakeholders of the project. The technical and financial aspects are well prepared to achieve the project objectives and ensure it integrates well with the existing water supply system of the area” “In this regard considering the credibility and competence shown by WAPCOS we are proposing that DPR be prepared by WAPCOS” September, 2014
“We would like to bring to your attention that the feasibility report submitted to you was prepared by WAPCOS after field visits and in consultations with various stakeholders of the project. The technical and financial aspects are well prepared to achieve the project objectives and ensure it integrates well with the existing water supply system of the area” “In this regard considering the credibility and competence shown by WAPCOS we are proposing that DPR be prepared by WAPCOS”
The Government of Mozambique through the Ministry of Agriculture have awarded a Consultancy Services for Irrigation Service Provider for Horticulture Business Line under Sustainable Irrigation Development Project As a part of the works executes so far, WAPCOS has completed the detailed designs for about 750 hectares with satisfactorily quality and consistency, out of 1300 hectares targeted, which we much appreciate and salute, now on. August, 2014
The Government of Mozambique through the Ministry of Agriculture have awarded a Consultancy Services for Irrigation Service Provider for Horticulture Business Line under Sustainable Irrigation Development Project As a part of the works executes so far, WAPCOS has completed the detailed designs for about 750 hectares with satisfactorily quality and consistency, out of 1300 hectares targeted, which we much appreciate and salute, now on.
This is to certify that M/s WAPCOS Limited have been working as Consultant for Punatsangchhu –I Hydroelectric Project in Bhutan (1200 MW) Preparation of Master Plan of project colony in area of 33 hectares comprising 540 units of residential buildings and non-residential buildings i.e. Office Complex. Field hostel, executive hostel, Auditorium, Club, Bank, Post office, Market Complex, Fire station, School, Basic Health Unit, Check Post etc. Preparation of Master Plan for infrastructural services i.e. water supply, sewerage, storm water, horticulture & power distribution network for the project colony. Tender Engineering & building works of colony including, preparation of cost estimates. Preparation of construction drawings for residential, non-residential building & infrastructure services. M/s WAPCOS Limited has worked successfully & with utmost professionalism. July, 2014
This is to certify that M/s WAPCOS Limited have been working as Consultant for Punatsangchhu –I Hydroelectric Project in Bhutan (1200 MW)
This is to certify that M/s WAPCOS Limited (A Government of India Undertaking) under Ministry of Water Resources has prepared the Project Completion Reports as the part of their Consultancy assignments for the following Hydroelectric projects in the Kingdom of Bhutan: Tala Hydroelectric Project (6X170MW) Chhukha Hydroelectric Project (4X84 MW) It is to put on record that the Completion Reports prepared by M/s WAPCOS Limited for these projects were of the highest quality and demonstrated a high level of professional input into the preparation of the Reports. June, 2014
This is to certify that M/s WAPCOS Limited (A Government of India Undertaking) under Ministry of Water Resources has prepared the Project Completion Reports as the part of their Consultancy assignments for the following Hydroelectric projects in the Kingdom of Bhutan:
This is to certify that M/s. WAPCOS Limited was awarded” Consultancy Services for Sea Water Intake & Outfall System for 2 x 800 MW Sri Damodaram Sanjeevaiah Thermal Power Station at Nelatur village, SPSR Nellore District, Andhra Pradesh. The Consultancy Services rendered so far by M/s. WAPCOS are satisfactory in implementing SWIO System, which is nearing completion. May, 2014
This is to certify that M/s. WAPCOS Limited was awarded” Consultancy Services for Sea Water Intake & Outfall System for 2 x 800 MW Sri Damodaram Sanjeevaiah Thermal Power Station at Nelatur village, SPSR Nellore District, Andhra Pradesh. The Consultancy Services rendered so far by M/s. WAPCOS are satisfactory in implementing SWIO System, which is nearing completion.
“During the period of 5 months, I have been constantly in touch with WAPCOS’ Officers. Their response has been very positive. Due to their concerted efforts, max number of DPRs have been submitted” May, 2014
“During the period of 5 months, I have been constantly in touch with WAPCOS’ Officers. Their response has been very positive. Due to their concerted efforts, max number of DPRs have been submitted”
WAPCOS Limited has completed the work “Preparation of Pre-Techno Economic Feasibility Report for development of a Container Cargo Port and Cruise Terminal at Baliharachandhi in Puri District” successfully and submitted the report within the stipulated time. The report are well documented and fulfill the objectives of the project. April, 2014
WAPCOS Limited has completed the work “Preparation of Pre-Techno Economic Feasibility Report for development of a Container Cargo Port and Cruise Terminal at Baliharachandhi in Puri District” successfully and submitted the report within the stipulated time. The report are well documented and fulfill the objectives of the project.
“I would like to put on record hard-work done by WAPCOS’ Officers in Surveys and Demarcation of Defence Land in Delhi Cantonment. Your Officers worked with utmost sincerity, dedication & devotion in completing survey works of Delhi Cantonments which was a gigantic task in itself” April, 2014
This is to certify that WAPCOS Limited is providing satisfactory Technical Services on Design & Construction of 2 Nos. 400 kV Double Circuit Transmission Line (around 80 km each) from Mangdechhu Hydro Electric Project to Jigmeling (via Goling) in line with Agreement signed between WAPCOS Limited & Bhutan Power Corporation Limited. Bhutan Power Corporation wishes WAPCOS Limited success in the years to come. March, 2014
This is to certify that WAPCOS Limited is providing satisfactory Technical Services on Design & Construction of 2 Nos. 400 kV Double Circuit Transmission Line (around 80 km each) from Mangdechhu Hydro Electric Project to Jigmeling (via Goling) in line with Agreement signed between WAPCOS Limited & Bhutan Power Corporation Limited. Bhutan Power Corporation wishes WAPCOS Limited success in the years to come.
This is to certify that WAPCOS Limited is providing Consultancy Services for Main Civil, Electro-Mechanical, Hydro-Mechanical and Infrastructure Works for Punatsangchhu –II Hydroelectric Project (6X170 MW) The Consultancy work is being provided satisfactorily as per agreed time schedule. March, 2014
This is to certify that WAPCOS Limited is providing Consultancy Services for Main Civil, Electro-Mechanical, Hydro-Mechanical and Infrastructure Works for Punatsangchhu –II Hydroelectric Project (6X170 MW) The Consultancy work is being provided satisfactorily as per agreed time schedule.
This is to certify that M/s WAPCOS Limited has undertaken a study of “Wave tranquility” and “Siltation pattern "of Bhagwati Bunder, Ratnagiri for assessment of suitability of site for creation of Coast Guard Reparir Infrastructure. M/s WAPCOS have handled the above assignment deftly and professionally and submitted the feasibility report within stipulated time. March, 2014
This is to certify that M/s WAPCOS Limited has undertaken a study of “Wave tranquility” and “Siltation pattern "of Bhagwati Bunder, Ratnagiri for assessment of suitability of site for creation of Coast Guard Reparir Infrastructure. M/s WAPCOS have handled the above assignment deftly and professionally and submitted the feasibility report within stipulated time.
WAPCOS Ltd. has been providing “Skill Support for Operation & Maintenance of Hwange Thermal Power station (920 MW)” since 2010 through deputation of experts in various fields and assisting Zimbabwe Power Company (ZPC) in improving the performance, availability and reliability of Hwange Power Station (HPS). WAPCOS Limited has provided “Operation & Maintenance support for Hwange Power Station” for 3rd year and successfully completed this year contract in February, 2014. Appreciate the commendable contribution by your experts towards improvement in performance of Hwange Power Station and skills upgradation of Zimbabwean officials. March, 2014
WAPCOS Ltd. has been providing “Skill Support for Operation & Maintenance of Hwange Thermal Power station (920 MW)” since 2010 through deputation of experts in various fields and assisting Zimbabwe Power Company (ZPC) in improving the performance, availability and reliability of Hwange Power Station (HPS). WAPCOS Limited has provided “Operation & Maintenance support for Hwange Power Station” for 3rd year and successfully completed this year contract in February, 2014. Appreciate the commendable contribution by your experts towards improvement in performance of Hwange Power Station and skills upgradation of Zimbabwean officials.
M/s WAPCOS Limited have been providing Consultancy Services for Water Services and Institutional Support Project; Design Check and Supervision of Emergency works for Nacala (World Bank Funded), Mozambique. WAPCOS scope also includes Supervision of the construction works in accordance with the Contract Conditions and the WASIS safeguard documents and local legislation including the environmental and social safeguards framework. The Performance of M/s WAPCOS is excellent and they have been carrying out all the activities in a professional manner for successful completion of the Project. December, 2013
M/s WAPCOS Limited have been providing Consultancy Services for Water Services and Institutional Support Project; Design Check and Supervision of Emergency works for Nacala (World Bank Funded), Mozambique. WAPCOS scope also includes Supervision of the construction works in accordance with the Contract Conditions and the WASIS safeguard documents and local legislation including the environmental and social safeguards framework. The Performance of M/s WAPCOS is excellent and they have been carrying out all the activities in a professional manner for successful completion of the Project.
We hereby would like to express our appreciation for the whole team of WAPCOS for successful completion of “Feasibility Studies of safegrade Alivation of Triangular plot & Jetty at Dahej and Hazira” within the stipulated time schedule. November,2013
We hereby would like to express our appreciation for the whole team of WAPCOS for successful completion of “Feasibility Studies of safegrade Alivation of Triangular plot & Jetty at Dahej and Hazira” within the stipulated time schedule.
WAPCOS Limited was awarded the work for “Consultancy and Feasibility Study for Demolition & Reconstruction of Naval Jetty at Kochi, Phase –I” WAPCOS Limited has rendered outstanding support and completed the excellent consultancy work in a time bound manner. October, 2013
WAPCOS Limited was awarded the work for “Consultancy and Feasibility Study for Demolition & Reconstruction of Naval Jetty at Kochi, Phase –I” WAPCOS Limited has rendered outstanding support and completed the excellent consultancy work in a time bound manner.
“This is to certify that M/s WAPCOS Limited (a Government of India undertaking) was engaged as Project Management Consultant for successful execution of the Nam Song Hydro Power Project (3x2 MW), Lao PDR. All the three units of the project, each of 2MW of Nam Song Hydro Power Project have been commissioned successfully on 31.08.2012 under the supervision of WAPCOS. EDL-GEN has enjoyed good working relations with WAPCOS. The professionalism imparted by WAPCOS throughout the duration, appropriate to the need of the project activities is highly appreciable.” September, 2012
“This is to certify that M/s WAPCOS Limited (a Government of India undertaking) was engaged as Project Management Consultant for successful execution of the Nam Song Hydro Power Project (3x2 MW), Lao PDR. All the three units of the project, each of 2MW of Nam Song Hydro Power Project have been commissioned successfully on 31.08.2012 under the supervision of WAPCOS. EDL-GEN has enjoyed good working relations with WAPCOS. The professionalism imparted by WAPCOS throughout the duration, appropriate to the need of the project activities is highly appreciable.”
“With comprehensive understanding of the scope of work and detailed analysis, WAPCOS’ Officer stationed here was able to synergise the efforts of various experts to achieve targets. Three DPRs have been submitted fully completed and seven others are nearing completion. With current pace of work I am certain that all DPRs will be submitted as per committed schedule” August, 2013
“With comprehensive understanding of the scope of work and detailed analysis, WAPCOS’ Officer stationed here was able to synergise the efforts of various experts to achieve targets. Three DPRs have been submitted fully completed and seven others are nearing completion. With current pace of work I am certain that all DPRs will be submitted as per committed schedule”
This is to confirm that WAPCOS Limited has successfully completed the following works for Energy, Water and Sanitation Authority (EWSA), Rwanda: Preparation of Pre-feasibility Report for 15 MW Peat-to-Power Project, Rulindo, Rwanda Preparation of Pre-feasibility Report for 50 MW Peat-to-Power Project, Rwabusoro and Bishya, Rwanda The studies were done competently and have been accepted as very useful for further development work. August, 2013
This is to confirm that WAPCOS Limited has successfully completed the following works for Energy, Water and Sanitation Authority (EWSA), Rwanda:
WAPCOS have completed the study on “Flood Vulnerability and Risk Assessment of Ahmedabad – Dholera Special Investment Region area”. We appreciate their sincere efforts and quality services that are rendered throughout the project tenure. August, 2013
WAPCOS have completed the study on “Flood Vulnerability and Risk Assessment of Ahmedabad – Dholera Special Investment Region area”. We appreciate their sincere efforts and quality services that are rendered throughout the project tenure.
This is to certify that WAPCOS Limited had “prepared the Water Security Plans (Phase II of the World Bank Aided Rural Water Supply Scheme and Sanitation) for Eleven Grama Panchayanths in Idukki & Kasaragod Districts on GIS platform”. The performance of WAPCOS Limited is appreciated. August, 2013
This is to certify that WAPCOS Limited had “prepared the Water Security Plans (Phase II of the World Bank Aided Rural Water Supply Scheme and Sanitation) for Eleven Grama Panchayanths in Idukki & Kasaragod Districts on GIS platform”. The performance of WAPCOS Limited is appreciated.
I would like to congratulate WAPCOS’ Team of Experts for their valuable efforts in preparation of “Strategy Paper on Integrated Water Resources Development and Management of Lake Chad Basin” and shaped it in the most professional way. WAPCOS has adopted a vey practical approach and brought out a number of short term, medium term and long term projects which would help in further development of the Lake Chad Basin area and generate employment and other opportunities. July, 2013
I would like to congratulate WAPCOS’ Team of Experts for their valuable efforts in preparation of “Strategy Paper on Integrated Water Resources Development and Management of Lake Chad Basin” and shaped it in the most professional way. WAPCOS has adopted a vey practical approach and brought out a number of short term, medium term and long term projects which would help in further development of the Lake Chad Basin area and generate employment and other opportunities.
I wish to share with you and WAPCOS Team my great Satisfaction on Achievement of the major milestone of River Diversion for construction of Punatsangchhu – II H. E. Project (6X170MW). The River Diversion was successfully accomplished before the oncoming monsoon, and will be a major factor in timely Project commissioning. WAPCOS team has put untiring efforts to work efficiently for the success of this event. I am sure that WAPCOS will continue to work with the same spirit for the timely and successful commissioning of the Punatsangchhu-II Hydroelectric Project. May, 2013
I wish to share with you and WAPCOS Team my great Satisfaction on Achievement of the major milestone of River Diversion for construction of Punatsangchhu – II H. E. Project (6X170MW). The River Diversion was successfully accomplished before the oncoming monsoon, and will be a major factor in timely Project commissioning. WAPCOS team has put untiring efforts to work efficiently for the success of this event. I am sure that WAPCOS will continue to work with the same spirit for the timely and successful commissioning of the Punatsangchhu-II Hydroelectric Project.
“M/s WAPCOS Limited has completed the work "Detailed Survey for Development of Inland Waterways in the State of” successfully and submitted the report within the stipulated time frame. The reports are well documented and fulfill the objectives of the project” March, 2013
“M/s WAPCOS Limited has completed the work "Detailed Survey for Development of Inland Waterways in the State of” successfully and submitted the report within the stipulated time frame. The reports are well documented and fulfill the objectives of the project”
The quality of services provided by engineering and other technical experts deployed in various PMUs was found to be satisfactory and keeping in mind the satisfactory performance of PMUs, the Commissionerate of Fisheries is recommending the continuance of PMUs for further period of 3 years. February, 2013
The quality of services provided by engineering and other technical experts deployed in various PMUs was found to be satisfactory and keeping in mind the satisfactory performance of PMUs, the Commissionerate of Fisheries is recommending the continuance of PMUs for further period of 3 years.
“This is to certify that WAPCOS has provided a hands-on training on computerised transmission line designing and profiling using PLS-CADD software to EDL Engineers from 10th September, 2012 to 12th September , 2012 at EDL head office, Vientiane. The training has been first to its kind in EDL and the concerned Engineers have been benefitted in their maximum capacity” December, 2012
“This is to certify that WAPCOS has provided a hands-on training on computerised transmission line designing and profiling using PLS-CADD software to EDL Engineers from 10th September, 2012 to 12th September , 2012 at EDL head office, Vientiane. The training has been first to its kind in EDL and the concerned Engineers have been benefitted in their maximum capacity”
“We have receive Field Investigation Report of 1500 Hand Pumps to be supplied and installed in Kampong Cham and Banteay Meanchey Provinces in Cambodia for augmentation of rural drinking water supply. We appreciate the report and the extensive field investigation work done by WAPCOS Limited and confirm the 1500 locations identified by WAPCOS for installation of Hand Pumps.” April, 2012
“We have receive Field Investigation Report of 1500 Hand Pumps to be supplied and installed in Kampong Cham and Banteay Meanchey Provinces in Cambodia for augmentation of rural drinking water supply. We appreciate the report and the extensive field investigation work done by WAPCOS Limited and confirm the 1500 locations identified by WAPCOS for installation of Hand Pumps.”
I wish to place on record my deep appreciation for the Strategy paper on “Integrated Water Resources Development and Management of SAVE Basin” prepared by WAPCOS, a public sector organization of your esteemed Ministry. Stakeholders Workshop that was organized by WAPCOS on 29 August 2012 was attended by senior representatives of the Government of Zimbabwe and stakeholders in the SAVE Catchment. It provided us with an opportunity for exchange of ideas and work on future course of action. The projects identified by WAPCOS in their paper have great potential for future co-operation between our two countries. August, 2012
I wish to place on record my deep appreciation for the Strategy paper on “Integrated Water Resources Development and Management of SAVE Basin” prepared by WAPCOS, a public sector organization of your esteemed Ministry. Stakeholders Workshop that was organized by WAPCOS on 29 August 2012 was attended by senior representatives of the Government of Zimbabwe and stakeholders in the SAVE Catchment. It provided us with an opportunity for exchange of ideas and work on future course of action. The projects identified by WAPCOS in their paper have great potential for future co-operation between our two countries.
“We would like to place on record our deep sense of satisfaction for the quality of work done by M/s WAPCOS Ltd. The presentation was quite lucid and compressive and the depth of study carried out in the complete assignment was fairly evident. It addressed many concerns of our team. NPCIL found gist of our study very comprehensive and to the point” July, 2012
“We would like to place on record our deep sense of satisfaction for the quality of work done by M/s WAPCOS Ltd. The presentation was quite lucid and compressive and the depth of study carried out in the complete assignment was fairly evident. It addressed many concerns of our team. NPCIL found gist of our study very comprehensive and to the point”
The Study conducted by WAPCOS has brought out a number of short term, medium term and long term projects which on implementation would usher a new era in the Save River basin to fulfill the aspirations of, not only people in that area, but the rest of Zimbabwe due to other downstream benefits of the intervention in Save River Basin. I would like to thank WAPCOS for their efforts in bringing out the Strategy Paper in such a short span of time and would welcome more and more participation by WAPCOS in my country, Zimbabwe in the development and management of water resources, inclusive of all interventions towards the achievement or realization of the objectives of this noble initiative. July, 2012
The Study conducted by WAPCOS has brought out a number of short term, medium term and long term projects which on implementation would usher a new era in the Save River basin to fulfill the aspirations of, not only people in that area, but the rest of Zimbabwe due to other downstream benefits of the intervention in Save River Basin. I would like to thank WAPCOS for their efforts in bringing out the Strategy Paper in such a short span of time and would welcome more and more participation by WAPCOS in my country, Zimbabwe in the development and management of water resources, inclusive of all interventions towards the achievement or realization of the objectives of this noble initiative.
It is to certify that WAPCOS Ltd. (a Govt. of India Undertaking) has been appointed as Third Party Inspection and Monitoring Agency at the Central level for the work of third party inspection & Monitoring of Basic Services to Urban Poor (BSUP) & Integrated Housing & Slum Development programme (IHSDP) Projects under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) in 15 states (for 56 BSUP and 67 IHSDP projects) vide this office letter no. N-11027/34/2009-IHSDP dated -15.01.2010 and N-11027/34/2009-IHSDP (Vol.II) dated-11.11.2011. So far the reports submitted by WAPCOS are in order and their performance has been found satisfactory. April, 2012
It is to certify that WAPCOS Ltd. (a Govt. of India Undertaking) has been appointed as Third Party Inspection and Monitoring Agency at the Central level for the work of third party inspection & Monitoring of Basic Services to Urban Poor (BSUP) & Integrated Housing & Slum Development programme (IHSDP) Projects under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) in 15 states (for 56 BSUP and 67 IHSDP projects) vide this office letter no. N-11027/34/2009-IHSDP dated -15.01.2010 and N-11027/34/2009-IHSDP (Vol.II) dated-11.11.2011. So far the reports submitted by WAPCOS are in order and their performance has been found satisfactory.
This is to certify that WAPCOS Limited, a Govt. of India Undertaking has successfully and timely submitted the feasibility reports for the following Small/Mini Hydro Power Projects in Zimbabwe during January 2012 as per the requirement of Rural Electrification Agency, Zimbabwe. Duru Hydro Electric Project (6MW) Siya Mini Hydro Scheme (250 kW) Ruti Mini Hydro Scheme (150kW) Feasibility Report for “Decentralised Solar Photovoltaic Power Solutions for Rural Areas in Masvingo Province” April, 2012
This is to certify that WAPCOS Limited, a Govt. of India Undertaking has successfully and timely submitted the feasibility reports for the following Small/Mini Hydro Power Projects in Zimbabwe during January 2012 as per the requirement of Rural Electrification Agency, Zimbabwe. Duru Hydro Electric Project (6MW) Siya Mini Hydro Scheme (250 kW) Ruti Mini Hydro Scheme (150kW) Feasibility Report for “Decentralised Solar Photovoltaic Power Solutions for Rural Areas in Masvingo Province”
WAPCOS has provided services of Bid Evaluation Report and Civil Works Contract Preparation for “Detailed Review, Pre Contract Services and Supervision of Civil Works Contracts for Multinational Nacala Road, Corridor Project-Phase-I; Lot-B: Ribauѐ-Malema (km 131 – km 234)” professionally and successfully within the stipulated time frame. October, 2011
WAPCOS has provided services of Bid Evaluation Report and Civil Works Contract Preparation for “Detailed Review, Pre Contract Services and Supervision of Civil Works Contracts for Multinational Nacala Road, Corridor Project-Phase-I; Lot-B: Ribauѐ-Malema (km 131 – km 234)” professionally and successfully within the stipulated time frame.
National Capital region Planning Board WAPCOS Limited has completed the assignment successfully on “Study on Water Supply and its Management in National Capital Region”. The scope of work included data collection and review of reports, analysis of availability of water from all possible sources, projections of water demand for year 2031, various scenarios for meeting demand & supply gap, institutional framework for drinking water supply, financial study and preparation of reports &organising workshops. We wish WAPCOS more success in the years to come. September, 2011
National Capital region Planning Board WAPCOS Limited has completed the assignment successfully on “Study on Water Supply and its Management in National Capital Region”. The scope of work included data collection and review of reports, analysis of availability of water from all possible sources, projections of water demand for year 2031, various scenarios for meeting demand & supply gap, institutional framework for drinking water supply, financial study and preparation of reports &organising workshops. We wish WAPCOS more success in the years to come.
This is to certify that M/s WAPCOS Limited has been awarded the Project Management Consultancy Services for work Under Basic Services to Urban Poor (BSUP) Schemes of JNNURM at Patna and Bodhgaya Cities of Bihar States. The Performance of M/s WAPCOS Limited is good. The progress reports have been timely submitted by WAPCOS and payment of their work has been made timely. March, 2011
This is to certify that M/s WAPCOS Limited has been awarded the Project Management Consultancy Services for work Under Basic Services to Urban Poor (BSUP) Schemes of JNNURM at Patna and Bodhgaya Cities of Bihar States. The Performance of M/s WAPCOS Limited is good. The progress reports have been timely submitted by WAPCOS and payment of their work has been made timely.
WAPCOS Limited was awarded the work-consultancy services for Detailed Project Report (DPR) of Kaliaghai-Kapaleswari-Baghai Basin Drainage Scheme in the districts of Paschim & Purba Medinipur, West Bengal. The WAPCOS Limited carried out the work in professional manner and prepared the Detailed Project Report for an estimated value of Rs. 650.00 crores (Rupees six hundred and fifty crores) only that has been approved by the Ganga Flood Control Commission and Central Water Commission, Govt. of India. The performance of the WAPCOS Limited was satisfactory. December, 2010
WAPCOS Limited was awarded the work-consultancy services for Detailed Project Report (DPR) of Kaliaghai-Kapaleswari-Baghai Basin Drainage Scheme in the districts of Paschim & Purba Medinipur, West Bengal. The WAPCOS Limited carried out the work in professional manner and prepared the Detailed Project Report for an estimated value of Rs. 650.00 crores (Rupees six hundred and fifty crores) only that has been approved by the Ganga Flood Control Commission and Central Water Commission, Govt. of India. The performance of the WAPCOS Limited was satisfactory.
This is to certify that WAPCOS Limited a Government of India Undertaking, has carried out the Survey and Investigations of Punatsangchhu–II Hydroelectric Project (990MW) in Bhutan and prepared the Detailed Project Report (DPR). The Department of Energy, Ministry of Economic Affairs, Royal Government of Bhutan as the implementing agency has found the works carried out by WAPCOS Limited of International Standards and we are satisfied with the quality of works done while preparing this Report. November, 2010
This is to certify that WAPCOS Limited a Government of India Undertaking, has carried out the Survey and Investigations of Punatsangchhu–II Hydroelectric Project (990MW) in Bhutan and prepared the Detailed Project Report (DPR). The Department of Energy, Ministry of Economic Affairs, Royal Government of Bhutan as the implementing agency has found the works carried out by WAPCOS Limited of International Standards and we are satisfied with the quality of works done while preparing this Report.
“Project Management Consultancy for 115 kV Double Circuit Paksong-Jiangxai-Bangyo Transmission Line and three Substation Projects in Lao PDR has been completed by WAPCOS Limited successfully and their Performance related to project was Excellent” October, 2010
“Project Management Consultancy for 115 kV Double Circuit Paksong-Jiangxai-Bangyo Transmission Line and three Substation Projects in Lao PDR has been completed by WAPCOS Limited successfully and their Performance related to project was Excellent”
“WAPCOS Ltd. is presently undertaking assignment funded by African Development Bank for Urban Water Supply, Sanitation and Institutional support project. WAPCOS Ltd. has carried out the above project professionally, prepared and submitted the detailed design reports. The reports are well documented and covers the objectives of the project. The team deployed by WAPCOS Ltd. for this project has been co-operative and believed in working in Team Spirit and has always supportive in sharing of Technical-Know –How and Knowledge cum experience they had in related fields” July, 2010
“WAPCOS Ltd. is presently undertaking assignment funded by African Development Bank for Urban Water Supply, Sanitation and Institutional support project. WAPCOS Ltd. has carried out the above project professionally, prepared and submitted the detailed design reports. The reports are well documented and covers the objectives of the project. The team deployed by WAPCOS Ltd. for this project has been co-operative and believed in working in Team Spirit and has always supportive in sharing of Technical-Know –How and Knowledge cum experience they had in related fields”
The certificate is presented to CMD, WAPCOS in appreciation of the Successful Project Management implementation of the “Augmentation of Water Supply Project, Dar es Salaam, Tanzania” June, 2017
The certificate is presented to CMD, WAPCOS in appreciation of the Successful Project Management implementation of the “Augmentation of Water Supply Project, Dar es Salaam, Tanzania”
I write to confirm that WAPCOS Limited has successfully discharged their obligation under the Engineering Contract for the review of the Rakiraki Bridge Construction Project. FRA wishes WAPCOS all the best in all its future endeavours and we look forward to a successful working relationship in the future June, 2017
I write to confirm that WAPCOS Limited has successfully discharged their obligation under the Engineering Contract for the review of the Rakiraki Bridge Construction Project. FRA wishes WAPCOS all the best in all its future endeavours and we look forward to a successful working relationship in the future
The Ministry of Rural Development presents its appreciation to CMD, WAPCOS for his dedication and commitment toward providing safe drinking water to the rural people of Cambodia for the project “Supply and Installation of 1500 Hand Pumps for Augmentation of Rural Water Supply in Cambodia” April, 2017
The Ministry of Rural Development presents its appreciation to CMD, WAPCOS for his dedication and commitment toward providing safe drinking water to the rural people of Cambodia for the project “Supply and Installation of 1500 Hand Pumps for Augmentation of Rural Water Supply in Cambodia”
This is to certify that WAPCOS Limited was awarded the work for “Supervision Consultancy for Fish Processing Plant in Elmina, Ghana”. The performance of WAPCOS during Project Supervision is excellent. May, 2016
This is to certify that WAPCOS Limited was awarded the work for “Supervision Consultancy for Fish Processing Plant in Elmina, Ghana”. The performance of WAPCOS during Project Supervision is excellent.
It is to appreciate that WAPCOS has successfully and satisfactorily completed the Consultancy Services for “Additional Work for Project Improving Quality of Power Supply in Maputo Distribution (Lot 1), Mozambique". We are glad to inform that we are utmost pleased with the efforts, professionalism, timely & quality services provided by WAPCOS Limited. March, 2016
It is to appreciate that WAPCOS has successfully and satisfactorily completed the Consultancy Services for “Additional Work for Project Improving Quality of Power Supply in Maputo Distribution (Lot 1), Mozambique". We are glad to inform that we are utmost pleased with the efforts, professionalism, timely & quality services provided by WAPCOS Limited.
I whole-heartedly would like to extend my gratitude for successfully completing "Engineering Design and Construction Supervision of Irrigation Schemes (Central and Western Regions) in Ghana" in an efficient way. All the works as per the Contract were successfully and efficiently completed by WAPCOS. The professionalism, dedication and sincerity exhibited by WAPCOS during project execution is commendable and deserves appreciation. We wish that our relationship with you will go a long way creating pillars of success. March, 2016
I whole-heartedly would like to extend my gratitude for successfully completing "Engineering Design and Construction Supervision of Irrigation Schemes (Central and Western Regions) in Ghana" in an efficient way. All the works as per the Contract were successfully and efficiently completed by WAPCOS. The professionalism, dedication and sincerity exhibited by WAPCOS during project execution is commendable and deserves appreciation. We wish that our relationship with you will go a long way creating pillars of success.
I appreciate the commendable contribution by your experts towards improvement in performance of Hwange Power Station and skills upgradation of Zimbabwean officials. May, 2015
I appreciate the commendable contribution by your experts towards improvement in performance of Hwange Power Station and skills upgradation of Zimbabwean officials.
I am pleased to convey the consent of the Government of Bangladesh on the Final Detailed Project Report for “Establishment of Inland Container River Port at Ashuganj” . Please accept the assurances of our highest consideration. May, 2015
I am pleased to convey the consent of the Government of Bangladesh on the Final Detailed Project Report for “Establishment of Inland Container River Port at Ashuganj” . Please accept the assurances of our highest consideration.